Homepage
 
Hood River Bridge »
 

 
Hot Topics »
 
 
Upcoming Events »
 




Port Meetings held every 1st & 3rd Tuesday of every month in the Board Room at 5 p.m. and are open to the public.

 

 
 
Hood River Bridge »
 

HOOD RIVER BRIDGE FAQ's

  • Length: .8 miles steel-grated deck (4,418’)~Built in 1924 (Oregon-Washington Bridge Co.)
  • Port of Hood River purchased bridge in 1950 for $800,000
  • Height Restriction: 14’ 7”
  • Lane Width (centerline stripe to guardrail): 9’ 4-¾”
  • Lift span raises deck from approximately 70’ to 150’ above water
  • There are 201 deck panels between the two approaches
  • Original wood decking replaced in 1950s
  • Lighting installed in 1960s
  • Bridge renovated and traffic axle counters installed in 1970’s
  • Repainted in 1980s; $2 million in repairs and improvements spent by Port through 1993
  • Seismic retrofit completed in 1996 ($350,126)
  • Washington approach widened in 1997 ($1,671,517)
  • Mechanical and lift span upgrade completed in 2000 ($2,237,253)
  • Decking and guardrail replacement completed in 2004 ($8,500,000)
  • Toll Plaza renovation & electronic toll collection completed in 2007 ($4,200,000)

1924 Toll

Persons over 7 years of age: 10 cents
Livestock: One animal, driven, led or ridden, + one person: 20 cents
Drove of animals (10 head or under)+one person: 10 cents each; 4 cents each additional
Animal drawn vehicle, 1-2 animals: 75 cents; 3 animals: $1.00; 4-6 animals: $1.50 (50 cents per animal over that)
Vehicle in tow: 50 cents
Bicycle: 20 cents; Motorcycle: 50 cents; Trailer: 50 cents
Auto: 75 cents
Truck < 1 ton: 75 cents; Truck between 1-2 ton: $1.50; Truck 2-4 ton: $2.00
Truck > 4 ton: $5.00; Tractor: $5.00

1950 Toll

1951 (Port Toll)

Auto: 60 cents + 10 cents each passenger
Pickup: 75 cents + 10 cents each passenger
Truck 4+-ton: $3.00
Bus: $1.00
Pedestrian: 25 cents
Auto: 50 cents
Truck: 50 cents per axle

1994 (Port Toll)

Toll Increase Placed in the Designated Bridge Repair and Replacement Fund
Auto: 75 cents
Truck: 75 cents per axle
Motorcycle: 50 cents
NO BICYCLES/PEDESTRIANS/ANIMALS ALLOWED
Discount books created for frequent commuters
80 tickets for $50 - discounted price
20 ticket-book available for $15 - regular non-discounted price

2007 - BreezeBy Electronic Toll
20% discount for use of transponders (minimum prepay: $20)

 

 
   Give your feedback on this article  
 

 
     
 
All content ©copyright Port of Hood River, 2007-2011.
Website by: webrock design